Infrastructure

Road debris, bridge maintenance FOD, rail contamination, port operations, and transport infrastructure safety.

27 files Last updated Oct 7, 2026
Komatsu Airport Runway Shut for Hours After Crack Found — Second Closure of 2026 Infrastructure
Latest

Komatsu Airport Runway Shut for Hours After Crack Found — Second Closure of 2026

A crack in Komatsu Airport's runway grounded flights for hours Monday, the second closure this year after a February pavement failure in Japan.

FODNews.com · · 4 min read

Earlier Coverage

Luxembourg Airport Halted Overnight After Unauthorized Drones Detected Over Runway, 19 Flights Diverted

Unauthorized drones over Findel forced Luxembourg Airport to halt flights for hours, diverting 19 aircraft and 1,800+ passengers across Europe.

· 3 min read

Drone Sighting Halts Departures at Reagan National, One of the Most Restricted Airspaces in the US

A suspected drone near Runway 19 halted departures at Reagan National for 20 minutes on Sept. 16, testing one of…

· 3 min read

Drone Sighting Halts All Departures at Heathrow Terminal 5

LONDON — A Heathrow drone sighting near Terminal 5 froze every outbound flight at London's busiest airport for 12 minutes…

· 3 min read

46 Shipping Containers Lost Overboard Off Philippine Coast, Coast Guard Issues Navigation Warning

Span Asia 39 lost 46 containers off Batangas, Philippines, on Sept. 3, prompting a Coast Guard navigational warning and drone…

· 4 min read

Drone Hovers 25 Feet Above Control Tower, Shuts Down San Diego International Airport for 2.5 Hours

A drone hovering 20-25 feet above San Diego airport's control tower triggered a 2.5-hour ground stop. No U.S. airport requires…

· 4 min read

Sydney Airport’s Fourth Ground-Safety Incident in a Month — Two Qantas Jets Cleared Onto Same Taxiway

Two Qantas jets were cleared onto the same taxiway at Sydney Airport, the fourth ground-safety event there in four weeks…

· 3 min read

Japan’s Transport Ministry Launches Structural Overhaul of Haneda’s Runway D Expansion Joints After Back-to-Back FOD Tire Blowouts

Japan's MLIT convened a second committee session July 28 to address Haneda Runway D expansion joint failures behind two tire…

· 4 min read

IATA, CANSO, and ACI Launch Joint Runway Safety Initiative to Cut Incursion Risk Worldwide

IATA, CANSO, and ACI launched a joint runway safety initiative to reduce incursion risk worldwide, as Aeromexico deploys Honeywell SURF-A…

· 4 min read

Tokyo Haneda Runway C Closed Twice in 48 Hours as Heat-Cracked Pavement Creates FOD Hazard — Pattern Echoes May’s Metal-Plate Tire Blowouts

Tokyo Haneda Runway C shut twice in 48 hours after heat-cracked pavement created a FOD hazard, echoing a pattern of…

· 4 min read

Sinkhole Beneath Main Runway Shuts Down Tri-Cities Airport, Cancels Flights for Days

A sinkhole beneath Runway 5/23 at Tri-Cities Airport forced a multi-day closure and mass flight cancellations in East Tennessee.

· 3 min read